Today I vent by the house. Here's the state of play:

Fences

  • The fence posts have been placed
  • The foundation for the gate was also placed
  • All materials are there
  • Next week, everything should be ready

Plumbing

  • Ground floor has the floor heating done. First floor too (probably)
  • Cellar is prepared for floor heating

Water softener

  • I've signed the papers for the water softener from aquagroup

AOB

I'll need to contact the electricity distributor to see their offer of 1000+ Euro for moving the counter inside the house.

I'll also need to see with the water people. they said they'll send me an offer, but I have not yet received anything.

Short term planning

  • the cellar holes will be drilled
  • the pipe connections will be done
  • I'll need to get phone cable (8 wires for the gate control)
  • the baseplate for the heat pump will be recast on Saturday
  • heat pump to be placed + tests to be run I guess

HTH,